| Type
of Projects |
Client |
| Loadout |
| -
Total
Bongkot Phase 3 Installation Program |
Nippon
Steel Corporation |
| -
New Container Cranes |
Semco Salvage |
| -
1630 mton 8-legged
Jacket Loadout Ballast Calculation |
Semco Salvage |
| - Loadout
Ballasting Calculations |
Vietranstimex |
| - Loadout
Ballast |
Mammoet |
| - Ballast
Calculation for Loadout of BT-A Topside on the barge “East Unity” |
Vietranstimex |
| - Loadout
of Jacket AW17 |
PTTEP |
| Lifting |
| - Lifting
Analysis of EPMI “Guntong D” Modules |
Sembawang Maritime Ltd |
| - TNB Logistic, Kapar Jetty, Continuous
Ship Unloader |
Semco Salvage |
| - 6” LLD-LLE/Subsea Gas Pipeline
Replacement Project |
P.T. Komaritim |
| - Lamma
Power Station New Continuous Ship Unloader |
Semco Salvage |
| - JVPC
Rang Dong WHP-N1 4 slot Upgrade |
Crest Engineers
Australia
|
| - SU
TU DEN “WHP-A” Jacket Lifting Analysis |
Cuu Long Operating Company |
| - SU
TU DEN “WHP-A” Deck Lifting Analysis |
Cuu Long Operating Company |
| - Rang
Dong Field “WHP-S1” Jacket Lifting Analysis |
VIETSOVPETRO Joint Venture |
| - Rang
Dong Field “WHP-E1” Deck Lifting Analysis |
VIETSOVPETRO Joint Venture |
| - Lifting
Frame Design |
Kvaerner |
| - Lifting
Analysis for Jacket |
Saipem |
| - Lifting
Study of Modules for Conoco Belanak FPSO at PTMI Batam Yard |
McDermott |
| - Lifting Frame Check |
Subsea 7 |
| - Compressor Offshore Lifting Analysis |
PTSC |
| - Cooler Offshore Lifting Analysis |
PTSC |
| - G1 & GS15 Fields Development (G1DP)
Project |
Clough Engineering Limited |
| Pile Driveability Analysis |
| SU TU DEN “WHP-A” Jacket Driveability
Analysis |
Cuu Long Operating Company |
| Jacket Upending Analysis |
| Malong Jacket 2-Block Upending Analysis |
TLO |
| Sotong Jacket Upending Analysis |
TLO |
| Sotong Jacket Upending Analysis |
TLO |
| SU TU DEN “WHP-A” Jacket Upending Analysis |
Cuu Long Operating Company |
| Rang Dong Field “WHP-S1” Jacket Upending
Analysis |
VIETSOVPETRO Joint Venture |
| Jacket On-Bottom Stability
Analysis |
|
| SU TU DEN “WHP-A” Jacket On-bottom Analysis |
Cuu Long Operating Company |
| Rang Dong Field “WHP-S1” Jacket On-bottom
Analysis |
VIETSOVPETRO Joint Venture |
| Yacheng Jacket On Bottom Stability Analysis |
Saipem |
| WHP-C1 Platform Offshore Installation Procedure,
On Bottom Stability Analysis |
VIETSOVPETRO Joint Venture |
| CLPP Jacket On Bottom Stability Analysis |
VIETSOVPETRO Joint Venture |
| Transportation &
Seafastening |
| Transportation of Numerous Container Cranes (KHIC,
Hyundai, Samsung) |
Sembawang Maritime Ltd |
| SSB “E11” Pipeline Installation |
Saipem (M) Sdn Bhd |
| Sedco Forex “Trident VII” Dry Tow |
Sembawang Maritime Ltd |
| ARII “BL”, “BSTA” & BZZB” Platform
Installation |
P.T. Nisconi |
| ARII “SBA”, “EWW” & “EWY”
Platform Installation |
P.T. Nisconi |
| P.T.T. Pipeline Project |
Saipem (
Thailand
) |
| Unocal ATTAKA “L” & Serang “SA”
Platform Installation |
P.T. Armandi Pranaupaya |
| Unocal “PWF” Platform Installation |
Thai
Nippon
Steel |
| Cilicap Pipeline Project |
P.T. Armandi Pranaupaya |
| Unocal “JWD” Platform Installation |
Thai
Nippon
Steel |
| Unocal “GWA” Platform Installation |
Thai
Nippon
Steel |
| Unocal “JWB” Platform Installation |
Thai
Nippon
Steel |
| BHP-Dai Hung Project |
Rockwater Offshore Contractors Pte Ltd |
| Unocal “PWG” Platform Installation |
Thai
Nippon
Steel |
| Unocal “EWT” Platform Installation |
Thai
Nippon
Steel |
| Total Tunu North Linepipes Installation Program |
Britoil Offshore Services Pte Ltd |
| POGO Tantawan Phase I Installation Program |
Nippon Steel Corporation |
| Unocal Phase 18 & 19 Installation Program |
Thai
Nippon
Steel |
| Total Bongkot Phase 3 Installation Program |
Nippon Steel Corporation |
| “MSEP” Jack-up Unit Dry Tow |
Sembawang Maritime |
| Unocal PLP-2 Platform (Phase XVIII) |
Thai
Nippon
Steel |
| ARII “SCA” Platform |
P.T. Nippon Steel, Batam |
| ARII GP2 Project |
P.T. Nippon Steel, Batam |
| Transportation of Port Container Crane (6 x Nos.) |
Semco Salvage |
| POGO “C” Platform |
Nippon Steel Corporation |
|
Saigon
Floating Hotel |
Sembawang Maritime Ltd |
| Submersible Drilling Barge Dry Tow |
Sembawang Maritime |
| Swamp Barge Dry Tow |
Sembawang Maritime |
| Cilicap Debottlenecking Project Transportation of
Reactor and Boiler |
Walter Wright Mammoet |
| POGO “D” Platform Installation Project |
Nippon Steel Corporation |
| Rang Dang 1st Phase (
Vietnam
) |
Brown & Root Engineering |
| Unocal Phase 21 Platform 212, 213 and 214
Installation |
Thai
Nippon
Steel |
| Total Peciko Phase I MWP-A and MWP-B Platforms |
Nippon Steel Corporation |
| Unocal Phase 21 Project TL-1, TL-2 and TL-3
Platforms |
Thai
Nippon
Steel |
| Unocal Phase 21 TR5 Platform Installation |
Thai
Nippon
Steel |
| POGO Benchamas Platform Installation |
Nippon Steel Corporation |
| Yetagun Development Project (Pipeline
Installation) |
Britoil Offshore (S) Pte Ltd |
| Unocal Phase 21 TP6 Platform Installation |
Thai
Nippon
Steel |
| Pailin Pipeline and Facilities Project |
Britoil Offshore Services Pte Ltd |
| JDA, Pailin and Benchamas Pipeline Project |
Global Industries Asia Pte Ltd |
| Keppel Bantagas Shipyard Drydocking Cranes
Relocation |
Keppel Shipyard |
| Total Peciko Phase II Jacket Transportation |
Nippon Steel Corporation |
| Unocal Phase 21/6 TR 7/TR 8 Jacket &
Deck Transportation Analysis |
Thai
Nippon
Steel |
| Helang Field Development Project |
Saipem (M) Sdn Bhd |
| Dry Tow of Dredger “Esprit III” |
Mermaid Marine |
| FPSO Mooring Structure |
Semco Salvage |
| Transportation of 3 in nos. Power Barges |
Semco Salvage |
| Subsea Umbilical Installation |
Halliburton F.E. Pte Ltd |
| Transportation & Seafastening of Deck, Piles,
Conductors & Linepipes for
North Lukut
Project |
Horizon Offshore Contractors |
| Transportation & Seafastening for Helang
Central Platform |
Malaysia
Shipyard & Engineering S/B |
Alcan Gove Third Stage Expansion G3 Project
e.g. Seafastening of Agglomerator Tanks,
Coarse
Seed
Filtration
Building
, Calciness etc. |
Alcan Bauxite & Alumin |
| 330’ Barge Transportation Analysis |
Keppel FELS |
| Nrpod Marine Transportation Engineering British
Gas Compression Module Lifting Analysis |
British Gas |
| Linepipe Transportation |
Leighton |
| FBE (SSB Project) Transportation Study |
Sarawak
Shell Berhad |
| Lan
Tay
Compression Module Transportation Study |
Petrovietnam |
| EPCIC of BH-D05A, BH-M04A and BH-103A Wellhead
Jackets, Topsides, Pipelines,
Tie-ins and Topsides Modifications (QP Project) |
Sime Darby |
| Structural Design |
| Helideck Design for Derrick Lay Barge “KP1” |
McDermott S.E.A (S) Pte Ltd |
| Installation of New Deck Crane on 2nd
Fos’cle Deck |
Halliburton
Subsea
|
| 2T Deck Crane FDN Design |
Dredger International |
| Crane FDN Design |
Dredging International |
| Crane Foundation Design |
Subsea 7 (S) Pte Ltd |
| Ruby-B Jacket Trunnion Design |
FB Vietnam |
| Design Hang Off and RW2 Deck Check |
Technip |
| Stinger Design |
Sarku Engineering |
| Consultancy – Ship Design |
| New Design of Shallow Water Lay Barge |
Pacific Pipelines International Pte Ltd |
| Full Design of Pipelay Barge |
Pacific Pipelines International Pte Ltd |
| 25x 12m Pontoon, Moon Pool Design |
Dredging International |
| Consultancy – Ship Design
(Modification) – Repair, Widening, Lengthening, Add Accommodation |
| “TOG MOR” Conversion |
Sembawang Maritime Ltd |
| OPI “DLB 264” Conversion |
Offshore Pipeline International Ltd |
| OHI “423” Conversion |
Offshore Pipeline International Ltd |
| Petronas Carigali Angsi Development Project (Andra
– A Platform) |
Nippon Steel Corporation |
| Barge Modification |
Global Submarine Cable |
| Naval Architectural – Sea
Motion Analysis |
| Ruby-FPSO Installation (
Vietnam
) |
Halliburton |
| 6” LLD-LLE/Subsea Gas Pipeline Replacement
Project |
P.T. Komaritim |
| Naval Architectural –
Mooring Analysis |
| Ruby-FPSO Installation (
Vietnam
) |
Halliburton |
| Peciko Field Development Project (
Indonesia
) |
P.T. Komaritim |
| JVPC Rang Dong WHP-N1 4 slot Upgrade |
Crest Engineers
Australia
|
| Naval Architectural –
Float-on & Float-off Ballasting |
| “MSEP” Jack-up Unit Dry Tow |
Sembawang Maritime |
|
Saigon
Floating Hotel |
Sembawang Maritime Ltd |
| Submersible Drilling Barge Dry Tow |
Sembawang Maritime |
| Swamp Barge Dry Tow |
Sembawang Maritime |
| Dry Tow of Dredger “Esprit III” |
Mermaid Marine |
| Transportation of 3 in nos. Power Barges |
Semco Salvage |
| Naval Architectural –
Vessel Stability Analysis |
| “M1” Platform |
Smedvig Offshore |
| Stability Analysis of Barge “East Unity”
during Loadout of BT-A Topside |
Vietranstimex |
| Stability Analysis for AFP Jacket Loadout |
Thai
Nippon
Steel |
| Offshore Pipeline
Engineering – Offshore Pipeline Installation Stress Analysis |
| Echo\Yodel Subsea Development Project |
Coflexip Stena Offshore
Asia
Pacific |
| Simpson/South Plato Field Development |
Tamboritha Consultants Pty Ltd |
| Esso Bream Gas Pipeline Installation |
Allseas Construction Contractor |
| Muthurajawela Tank Farm Project |
Leighton Contractors Sdn Bhd |
| Shell Sangu-A 20” Gas Tie-In Spool and Riser Remedation Project |
GIL Mauritius
Thailand
|
| Talisman Energy Block PM3 CAA Pipeline
Installation |
Global Offshore
Malaysia
|
| Betara Complex Development Offshore Pipelaying |
Stolt Offshore |