Type of Projects |
Client |
Loadout |
Total Bongkot Phase 3 Installation Program |
Nippon Steel Corporation |
New Container Cranes |
Semco Salvage |
1630 mton 8-legged Jacket Loadout Ballast Calculation |
Semco Salvage |
Loadout Ballasting Calculations |
Vietranstimex |
Loadout Ballast |
Mammoet |
Ballast Calculation for Loadout of BT-A Topside on the barge “East Unity” |
Vietranstimex |
Loadout of Jacket AW17 |
PTTEP |
Lifting |
Lifting Analysis of EPMI “Guntong D” Modules |
Sembawang Maritime Ltd |
TNB Logistic, Kapar Jetty, Continuous Ship Unloader |
Semco Salvage |
6” LLD-LLE/Subsea Gas Pipeline Replacement Project |
P.T. Komaritim |
Lamma Power Station New Continuous Ship Unloader |
Semco Salvage |
JVPC Rang Dong WHP-N1 4 slot Upgrade |
Crest Engineers Australia |
SU TU DEN “WHP-A” Jacket Lifting Analysis |
Cuu Long Operating Company |
SU TU DEN “WHP-A” Deck Lifting Analysis |
Cuu Long Operating Company |
Rang Dong Field “WHP-S1” Jacket Lifting Analysis |
VIETSOVPETRO Joint Venture |
Rang Dong Field “WHP-E1” Deck Lifting Analysis |
VIETSOVPETRO Joint Venture |
Lifting Frame Design |
Kvaerner |
Lifting Analysis for Jacket |
Saipem |
Lifting Study of Modules for Conoco Belanak FPSO at PTMI Batam Yard |
McDermott |
Lifting Frame Check |
Subsea 7 |
Compressor Offshore Lifting Analysis |
PTSC |
Cooler Offshore Lifting Analysis |
PTSC |
G1 & GS15 Fields Development (G1DP) Project |
Clough Engineering Limited |
Pile Driveability Analysis |
SU TU DEN “WHP-A” Jacket Driveability Analysis |
Cuu Long Operating Company |
Jacket Upending Analysis |
Malong Jacket 2-Block Upending Analysis |
TLO |
Sotong Jacket Upending Analysis |
TLO |
Sotong Jacket Upending Analysis |
TLO |
SU TU DEN “WHP-A” Jacket Upending Analysis |
Cuu Long Operating Company |
Rang Dong Field “WHP-S1” Jacket Upending Analysis |
VIETSOVPETRO Joint Venture |
Jacket On-Bottom Stability Analysis |
|
SU TU DEN “WHP-A” Jacket On-bottom Analysis |
Cuu Long Operating Company |
Rang Dong Field “WHP-S1” Jacket On-bottom Analysis |
VIETSOVPETRO Joint Venture |
Yacheng Jacket On Bottom Stability Analysis |
Saipem |
WHP-C1 Platform Offshore Installation Procedure, On Bottom Stability Analysis |
VIETSOVPETRO Joint Venture |
CLPP Jacket On Bottom Stability Analysis |
VIETSOVPETRO Joint Venture |
Transportation & Seafastening |
Transportation of Numerous Container Cranes (KHIC, Hyundai, Samsung) |
Sembawang Maritime Ltd |
SSB “E11” Pipeline Installation |
Saipem (M) Sdn Bhd |
Sedco Forex “Trident VII” Dry Tow |
Sembawang Maritime Ltd |
ARII “BL”, “BSTA” & BZZB” Platform Installation |
P.T. Nisconi |
ARII “SBA”, “EWW” & “EWY” Platform Installation |
P.T. Nisconi |
P.T.T. Pipeline Project |
Saipem ( Thailand ) |
Unocal ATTAKA “L” & Serang “SA” Platform Installation |
P.T. Armandi Pranaupaya |
Unocal “PWF” Platform Installation |
Thai Nippon Steel |
Cilicap Pipeline Project |
P.T. Armandi Pranaupaya |
Unocal “JWD” Platform Installation |
Thai Nippon Steel |
Unocal “GWA” Platform Installation |
Thai Nippon Steel |
Unocal “JWB” Platform Installation |
Thai Nippon Steel |
BHP-Dai Hung Project |
Rockwater Offshore Contractors Pte Ltd |
Unocal “PWG” Platform Installation |
Thai Nippon Steel |
Unocal “EWT” Platform Installation |
Thai Nippon Steel |
Total Tunu North Linepipes Installation Program |
Britoil Offshore Services Pte Ltd |
POGO Tantawan Phase I Installation Program |
Nippon Steel Corporation |
Unocal Phase 18 & 19 Installation Program |
Thai Nippon Steel |
Total Bongkot Phase 3 Installation Program |
Nippon Steel Corporation |
“MSEP” Jack-up Unit Dry Tow |
Sembawang Maritime |
Unocal PLP-2 Platform (Phase XVIII) |
Thai Nippon Steel |
ARII “SCA” Platform |
P.T. Nippon Steel, Batam |
ARII GP2 Project |
P.T. Nippon Steel, Batam |
Transportation of Port Container Crane (6 x Nos.) |
Semco Salvage |
POGO “C” Platform |
Nippon Steel Corporation |
Saigon Floating Hotel |
Sembawang Maritime Ltd |
Submersible Drilling Barge Dry Tow |
Sembawang Maritime |
Swamp Barge Dry Tow |
Sembawang Maritime |
Cilicap Debottlenecking Project Transportation of Reactor and Boiler |
Walter Wright Mammoet |
POGO “D” Platform Installation Project |
Nippon Steel Corporation |
Rang Dang 1st Phase ( Vietnam ) |
Brown & Root Engineering |
Unocal Phase 21 Platform 212, 213 and 214 Installation |
Thai Nippon Steel |
Total Peciko Phase I MWP-A and MWP-B Platforms |
Nippon Steel Corporation |
Unocal Phase 21 Project TL-1, TL-2 and TL-3 Platforms |
Thai Nippon Steel |
Unocal Phase 21 TR5 Platform Installation |
Thai Nippon Steel |
POGO Benchamas Platform Installation |
Nippon Steel Corporation |
Yetagun Development Project (Pipeline Installation) |
Britoil Offshore (S) Pte Ltd |
Unocal Phase 21 TP6 Platform Installation |
Thai Nippon Steel |
Pailin Pipeline and Facilities Project |
Britoil Offshore Services Pte Ltd |
JDA, Pailin and Benchamas Pipeline Project |
Global Industries Asia Pte Ltd |
Keppel Bantagas Shipyard Drydocking Cranes Relocation |
Keppel Shipyard |
Total Peciko Phase II Jacket Transportation |
Nippon Steel Corporation |
Unocal Phase 21/6 TR 7/TR 8 Jacket & Deck Transportation Analysis |
Thai Nippon Steel |
Helang Field Development Project |
Saipem (M) Sdn Bhd |
Dry Tow of Dredger “Esprit III” |
Mermaid Marine |
FPSO Mooring Structure |
Semco Salvage |
Transportation of 3 in nos. Power Barges |
Semco Salvage |
Subsea Umbilical Installation |
Halliburton F.E. Pte Ltd |
Transportation & Seafastening of Deck, Piles, Conductors & Linepipes for North Lukut Project |
Horizon Offshore Contractors |
Transportation & Seafastening for Helang Central Platform |
Malaysia Shipyard & Engineering S/B |
Alcan Gove Third Stage Expansion G3 Project
e.g. Seafastening of Agglomerator Tanks, Coarse Seed Filtration Building , Calciness etc. |
Alcan Bauxite & Alumin |
330’ Barge Transportation Analysis |
Keppel FELS |
Nrpod Marine Transportation Engineering British Gas Compression Module Lifting Analysis |
British Gas |
Linepipe Transportation |
Leighton |
FBE (SSB Project) Transportation Study |
Sarawak Shell Berhad |
Lan Tay Compression Module Transportation Study |
Petrovietnam |
EPCIC of BH-D05A, BH-M04A and BH-103A Wellhead Jackets, Topsides, Pipelines, Tie-ins and Topsides Modifications (QP Project) |
Sime Darby |
Structural Design |
Helideck Design for Derrick Lay Barge “KP1” |
McDermott S.E.A (S) Pte Ltd |
Installation of New Deck Crane on 2nd Fos’cle Deck |
Halliburton Subsea |
2T Deck Crane FDN Design |
Dredger International |
Crane FDN Design |
Dredging International |
Crane Foundation Design |
Subsea 7 (S) Pte Ltd |
Ruby-B Jacket Trunnion Design |
FB Vietnam |
Design Hang Off and RW2 Deck Check |
Technip |
Stinger Design |
Sarku Engineering |
Consultancy – Ship Design |
New Design of Shallow Water Lay Barge |
Pacific Pipelines International Pte Ltd |
Full Design of Pipelay Barge |
Pacific Pipelines International Pte Ltd |
25x 12m Pontoon, Moon Pool Design |
Dredging International |
Consultancy – Ship Design (Modification) – Repair, Widening, Lengthening, Add Accommodation |
“TOG MOR” Conversion |
Sembawang Maritime Ltd |
OPI “DLB 264” Conversion |
Offshore Pipeline International Ltd |
OHI “423” Conversion |
Offshore Pipeline International Ltd |
Petronas Carigali Angsi Development Project (Andra – A Platform) |
Nippon Steel Corporation |
Barge Modification |
Global Submarine Cable |
Naval Architectural – Sea Motion Analysis |
Ruby-FPSO Installation ( Vietnam ) |
Halliburton |
6” LLD-LLE/Subsea Gas Pipeline Replacement Project |
P.T. Komaritim |
Naval Architectural – Mooring Analysis |
Ruby-FPSO Installation ( Vietnam ) |
Halliburton |
Peciko Field Development Project ( Indonesia ) |
P.T. Komaritim |
JVPC Rang Dong WHP-N1 4 slot Upgrade |
Crest Engineers Australia |
Naval Architectural – Float-on & Float-off Ballasting |
“MSEP” Jack-up Unit Dry Tow |
Sembawang Maritime |
Saigon Floating Hotel |
Sembawang Maritime Ltd |
Submersible Drilling Barge Dry Tow |
Sembawang Maritime |
Swamp Barge Dry Tow |
Sembawang Maritime |
Dry Tow of Dredger “Esprit III” |
Mermaid Marine |
Transportation of 3 in nos. Power Barges |
Semco Salvage |
Naval Architectural – Vessel Stability Analysis |
“M1” Platform |
Smedvig Offshore |
Stability Analysis of Barge “East Unity” during Loadout of BT-A Topside |
Vietranstimex |
Stability Analysis for AFP Jacket Loadout |
Thai Nippon Steel |
Offshore Pipeline Engineering – Offshore Pipeline Installation Stress Analysis |
Echo\Yodel Subsea Development Project |
Coflexip Stena Offshore Asia Pacific |
Simpson/South Plato Field Development |
Tamboritha Consultants Pty Ltd |
Esso Bream Gas Pipeline Installation |
Allseas Construction Contractor |
Muthurajawela Tank Farm Project |
Leighton Contractors Sdn Bhd |
Shell Sangu-A 20” Gas Tie-In Spool and Riser Remedation Project |
GIL Mauritius Thailand |
Talisman Energy Block PM3 CAA Pipeline Installation |
Global Offshore Malaysia |
Betara Complex Development Offshore Pipelaying |
Stolt Offshore |